My bathroom fitting - Plan

Remove existing decayed plaster
Build stud wall to house shower
Build niches
First fix electrics - lights and extractor
Remove existing floor boards. Add extra noggins and strengthen existing joists
First fix plumbing
Render exterior walls. Plaster ceiling. Plasterboard stud wall (DB check) - Fill stud void with Celotex
18mm WBP Ply to floor and wet shower area stud walls - Fixing with dry phosphate screws 150mm
Mapei - Mapelastic Aquadefense over all new flooring
Fit shower tray
Bal WP1 Kit - Tanking kit for shower area- down onto shower tray
Offer up freestanding bath, exposed trap and check waste requirements
Tile room
Final fix all products